ASS美女撒尿PICS,东京热AV人妻无码专区,男人的天堂AV网站,日本人妻巨大乳挤奶水免费

歡迎進入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

脫硫設(shè)備的操作規(guī)程及維護保養(yǎng)!

脫硫設(shè)備在運行過程中,如果操作不當,不注意維護保養(yǎng),經(jīng)常出現(xiàn)脫硫塔內(nèi)結(jié)垢、管道堵塞、機械密封損壞等各種問題,下面對脫硫設(shè)備的操作規(guī)程及維護保養(yǎng)注意事項做簡要概述。

In the operation process of desulfurization equipment, if the operation is improper and maintenance is not paid attention to, there are often various problems such as scaling in the desulfurization tower, pipeline blockage, mechanical seal damage, etc. the following is a brief overview of the operation procedures and maintenance precautions of desulfurization equipment.
脫硫除塵裝置在運行時需要對各個組件進行檢查。
During the operation of desulfurization and dust removal device, each component needs to be inspected.
(1)檢查脫硫裝置,排污口要關(guān)閉,不可無水運行,不得漏風,以防無法閉縫運行。
(1) Check the desulfurization device, the drain outlet should be closed, no water running, no air leakage, in case it can not be closed operation.
(2)鍋爐點火前把水池放滿水,檢查水泵是否正轉(zhuǎn),確認無誤后,點火前開啟水泵或自來水閥門,保證脫硫塔內(nèi)有水,以防玻璃鱗片被煙氣燒壞。
(2) Before the ignition of the boiler, fill the pool with water and check whether the water pump is running normally. After confirmation, open the water pump or tap water valve before ignition to ensure that there is water in the desulfurization tower, so as to prevent the glass flakes from being burned by the flue gas.
(3)正常運行時,保證脫硫裝置的水位,才能達到好的脫硫效果。
(3) In normal operation, only by ensuring the water level of desulfurization device can good desulfurization effect be achieved.
                       沼氣脫硫
(4)鍋爐點火的同時,開啟脫硫泵,防治脫水系統(tǒng)阻塞導(dǎo)致塔體的損壞。
(4) At the same time of boiler ignition, start desulfurization pump to prevent tower damage caused by dehydration system blockage.
(5)確保脫硫液PH值≥12時才能達到脫硫效果。
(5) The desulfurization effect can be achieved only when the pH value of desulfurization solution is more than or equal to 12.
(6)脫硫設(shè)備采用的循環(huán)水清潔度要在90%以上,否則會沖刷脫硫塔體,造成設(shè)備損壞。
(6) The cleanliness of circulating water used in desulfurization equipment should be more than 90%, otherwise it will wash the desulfurization tower and cause equipment damage.
(7)循環(huán)檢查裝置,觀察流水情況。引風機不可帶水,如引風機帶水要立即降低除塵內(nèi)水位。
(7) Circulation inspection device, observe the flow situation. The induced draft fan is not allowed to carry water. If the induced draft fan carries water, the water level in the dedusting chamber shall be reduced immediately.
停車時的維護保養(yǎng)
Maintenance when parking
(1)短時間減量或切氣,脫硫系統(tǒng)不必停車,可根據(jù)時間長短適當減量,或保持原狀。否則吸收再生液量減少后,一旦加量有時難以保證脫硫效果。
(1) The desulfurization system doesn't need to be shut down for short time reduction or gas cutting, but can be reduced appropriately according to the length of time or kept in the original state. Otherwise, once the amount of regeneration liquid is reduced, it is difficult to ensure the desulfurization effect.
(2)長時間停車,要關(guān)閉脫硫泵、沖洗泵出口閥門,停泵,關(guān)入口閥門,從泵導(dǎo)淋排液,切斷上述泵的電源,并定期盤車,將溶液分別存放在三個槽內(nèi),并檢查有無泄漏的地方。冬季要做好保溫,少排導(dǎo)淋,防凍堵。
(2) Shut down the outlet valve of desulfurization pump and flushing pump for a long time, shut down the pump, close the inlet valve, drain the liquid from the pump, cut off the power supply of the above pump, turn the gear regularly, store the solution in three tanks respectively, and check for leakage. In winter, it is necessary to keep warm, discharge less water and prevent freezing.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃氣體凈化及利用行業(yè)